COMPLETED PROJECTS IN AUSTRALIA


Design Of Kings & German Timber Bridge Replacement
Location: Queensland, Australia
Client: Fulton Hogan
Duration: January 2016 - June 2016
Project Details: Design and construction of 2 QR timber bridge replacements:
  • Kings Bridge (72m long)
  • German Bridge (15m long)

Pre-bid services for Hey River - Boyd Road
Location: Queensland, Australia
Client: NRW, Australia
Duration:December 2014
Project Details: Design and preparation of BOQ for the following:
  • Road Alignment and Pavement Design
  • Pavement design
  • Hardstands
  • Catchment delineation and 1D modeling of all culverts along the road
  • Construction of water pond
  • Pavement Design of proposed airstrip

D & C Prebid services - Carmichael Mine Access Road
Location: Queensland, Australia
Client: NRW, Australia
Duration: April 2013
Project Details: Design and preparation of BOQ for:
  • Water infrastructure for construction including a new dam and pipeline for water conveyance
  • Pavement for proposed airport and corresponding facilities
  • Landfill

North Galilee Basin Rail (NGBR) Project
Location: Queensland, Australia
Client:POSCO E&C
Duration: June 2014 - December 2014
Project Details: An optimization study was carried out to determine the potential benefit for the project and a list of value engineering items were developed and discipline based FEED level redesign of elements identified through value engineering was undertaken.

Carmichael Rail Design (CRD) Project
Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: May 2015 - June 2018
Project Details: The dedicated green field rail line to coonect Carmichael Mine with Abbot Point Coal Terminal was developed to provide an independent connectivity between Mine to Port. The assigment includes Detail Design of Caeminchael Rail Line.

Carmichael Mine Access Road Upgrade Project
Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: October - November 2014
Project Details: Adani Mining is proposing to develop thermal coal mine in North Galilee Basin, Central Queensland. For the effective operation of mine, suitable road link to the major regional centres of Townsville, Mackay and Rockhampton must be established. This project consists of design of 90 km long road between Elgin-Moray Road and Moray- Carmichael Road which is at present a rural unsealed road. Design works for hydrologic, hydraulic and structure design were undertaken.

North Galilee Basin Rail (NGBR) Project
Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: May 2013 - September 2013
Project Details: A dedicated green field rail line to connect Carmichael Mine with Abbot Point Coal Terminal is being developed to provide an independent connectivity between Mine to Port. It is a bi-directional single line railway with passing loops provided at strategic intervals. Standard Gauge line with Diesel Traction is proposed.

North Galilee Basin Rail (NGBR) Project
Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: October - November 2014
Project Details: Coal Terminal is being developed to provide an independent connectivity between Mine to Port.
  • Route Length : 382.4 km
  • Design Traffic : 100 MTPA
  • Loading Standard : 32.5 T
  • Passing Loops : 9 nos
  • Design Speed : 80 km/h for loaded trains; 100 km/h unloaded trains.

Carmichael Rail North Goonyella Branch Line (NGBL) Project
Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: October 2012 - January 2013 October 2012 - April 2013
Project Details:A dual gauge branch line connecting the Carmichael Rail Line directly to a junction on Aurizon's Goonyella Rail System was proposed to provide direct route to the port
  • Route Length : 65 Km
  • Gauge : Dual Gauge (Standard + Narrow)
  • Design Traffic : 100 MPTA
  • Loading Standard : 32.5T/26T.

Carmichael Rail Line (CRL)
Location: Queensland, Australia
Client: Adani Mining Pty Ltd, Australia
Duration: August 2011 - February 2012 June 2012 - February 2013
Project Details:A green field heavy haul rail line is proposed between carmichael caol mine located in central queensland to aurizon's (QR national) existing rail syatem through moranbah in queensland.
 
 
 
 
Corporate Office:

AARVEE ASSOCIATES ARCHITECTS ENGINEERS & CONSULTANTS PVT. LTD.
Suite - 81, Level 54,
111 Eagle Street, Brisbane
QLD 4000, Australia

 
Regional Office:

AARVEE ASSOCIATES ARCHITECTS ENGINEERS & CONSULTANTS PVT. LTD.
Suite 9, 5 Hamill St.
Townsville,
QLD 4810, Australia

View Projects