PMC for Construction of Third Line Track between Lanigarh Road – Bissamcuttack and Bissamcuttack - Rayagada in Sambalpur & Waltair Divisions of East Coast Railway, Odisha, India.

PMC for Railway Electrification Project of Design, Supply, Erection, Testing and Commissioning of 24kV, 50 Hz, single phase electrification works (OHE, TSS, SCADA, Electric General, S&T and Civil Engineering works) in Ahmedabad - Rajkot section & Mehsana - Viramgam-Samkhiyali section of Ahmedabad & Rajkot division of Western Railway for CORE, Gujarat, India.

Techno-Economic Feasibility Report for Mechanisation of North Cargo Berth – III (NCB-III) for handling Dry Bulk Cargo at V.O. Chidambaranar Port, Tamil Nadu, India.

DPR for 4/6 Lane Access Controlled Green Field Expressway connecting New Capital City Amaravathi to Ananthapuramu with connectivity to Kurnool and Kadapa in Andhra Pradesh, India.

Third Party Quality Assurance & Quality Control Agency for works taken up under AMRUT Scheme in 12 ULBs of Telangana, India.

Independent Auditor for the Operational Audit of Kakinada Deep Water Port in Andhra Pradesh, India

AE for Rehabilitation and up-gradation of NH67 Gooty – Tadipatri Section (63km) to two lane with paved shoulder through EPC mode, Andhra Pradesh, India.

Prefeasibility Report for the proposed Pumped Storage Project near Gorakallu Reservoir in Andhra Pradesh and near Renuka Sagar Reservoir in Karnataka, India.

DPR for Sewerage and Strom Water Drainage system in ULBs of Telangana – Package – IV (Hyderabad Region – 6 Districts) under Telangana Municipal Development Project, India.

Feasibility Study for proposed MRTS Corridor from Miyapur to Shilparamam and Gachibowli, Hyderabad, Telangana, India.

PMC to Design, Develop, Manage and Implement Smart City projects under Smart City Mission in Karimnagar, Andhra Pradesh for Karimnagar Smart City Corporation Limited, India.

IE for 4 Laning of Jhansi-Khajuraho Section of NH-75/76 in the State of Uttar Pradesh & Madhya Pradesh for NHAI, India

DPR for development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of Freight movement in India for Lot 5/Package-5 – Maharastra under Bharatmala Pariyojana for NHAI, India.

DPR and Detailed Engineering for Drinking Water Supply projects of Kadapa and Chittoor districts for Andhra Pradesh Drinking Water Supply Corporation, India.

Updation of Revenue Database and Rationalisation of House Numbering (including integration & updation with GIS Base Map) in respect of 30 Urban Local Bodies in Andhra Pradesh, Package I – West Godavari, Package IV - Srikakulam, Package V - East Godavari for Andhra Pradesh Municipal Project (APMDP), India.

Comprehensive Traffic and Transportation Study for Andhra Pradesh Capital Region Development Authority Jurisdiction, India.

Project Management Consultant to Design, Develop, Manage and Implement Smart City projects under Smart City Mission in Allahabad, Uttar Pradesh, India.

Carrying out Feasibility Study (FS), Detailed Project Report (DPR) for doubling of East Corridor Spur Line & misc. works for Chhattisgarh Railway Corporation Ltd., India.

Acceleration of Passenger Trains Traveling Speed on the section between Nagpur and Secunderabad to Semi High Speed up to 200km/hr for Russian Railways, India.

Authority's Engineer for Construction of Bypass to Vizainagaram Town (New NH-26) to (Raipur – Visakhapatnam Section) to 4-lane, Andhra Pradesh, India.

Independent Engineer Services to Supervise the work of Operations & Maintenance in the BOT Packages of Nehru Outer Ring Road, Hyderabad for HGCL, India.

Preparation of GIS Base Map for 14 towns of Bihar for Urban Development & Housing Department Support Program for Urban Reforms (SPUR), Bihar, India.

Design Engineering Consultancy Services for Palamuru-Rangareddy Lift Irrigation Scheme, Telangana, India

Detailed Design for 5 Elevated Metro-Rail stations on North - South Corridor of Ahmedabad Metro Rail Project, Gujarat.